Installing a Vortceptor: 3-hour Timelapse at Highview Estate, Geelong

installing vortceptor highview estate geelong

Our latest installation video features the Vortceptor – part of our range of high-performance Gross Pollutant Traps (GPTs). Located in the Highview Estate in the City of Greater Geelong council area, our timelapse cameras were on the ground to capture this quick & seamless 3-hour installation.

With excellent pollution removal capabilities, these devices use a combination of continuous deflective separation and a non-blocking screen to sequester gross pollutants. They have been rated at 70% removal of TSS (Total Suspended Solids) and 99.9% capture of Gross Pollutants, which places them above key industry performance benchmarks.
Engineered from fibre reinforced polymer (FRP), the Vortceptor is lightweight and provides on-site efficiency and low freight costs. On-site digging equipment can often be used for lifting and their sustainable design leads to a reduced carbon footprint.

The flow

News | Events | Updates

You can constantly keep up to date by visiting our news pages but for added convenience why not join our mailing list and have it delivered to your inbox.

  • This field is for validation purposes and should be left unchanged.
Scroll to Top