StormTech – Raingarden with Stormwater Harvesting

Share on facebook
Share on twitter
Share on linkedin
Share on pinterest
Share on email
stormtech

Moreland City Council – Fawkner Victoria – Raingarden with Stormwater Harvesting

Installation date: August 2014

GENERAL PROJECT INFORMATION

  • The Charles Mutton Reserve in Fawkner Victoria is home to two football ovals, a running and athletics circuit, tennis courts and lawn bowls. Moreland City Council identified a need to revitalise the reserve and future proof it against drought.
  • Consulting Engineer Spiire was engaged to prepare a stormwater harvesting scheme using water sensitive urban design principles. This is intended as a foundation for a future masterplan for the site.
  • Spiire selected ADS Pipe StormTech chambers as a rainwater harvesting solution.

DESIGN CONSIDERATIONS

  • Minimising the raingarden footprint, visibility of storages and mechanical infrastructure areas.

OUTCOMES

  • The final design included a stormwater diversion system and underground StormTech SC740 storage tank, distribution infrastructure including rising main and pumps, a raingarden to treat sediments and nutrients, storage to provide volume for irrigation cycles and UV disinfection to treat pathogens. 
  • The expected water harvest of 20ML/year will reduce the sites reliance on potable water by 70% and reduce stormwater runoff to nearby Merri Creek.
Stormwater harvesting scheme Charles Mutton Reserve
Stormwater harvesting scheme Charles Mutton Reserve
Stormwater harvesting scheme Charles Mutton Reserve
Share on facebook
Share on twitter
Share on linkedin
Share on pinterest
Share on email

More
articles

spel logo

The flow

News | Events | Updates

You can constantly keep up to date by visiting our news pages but for added convenience why not join our mailing list and have it delivered to your inbox.

Scroll to Top