Stormwater Runoff From Busy Airport Safely Discharged to Prestigious Lake

Share on facebook
Share on twitter
Share on linkedin
Share on pinterest
Share on email

 

Location: Canberra, ACT

Configuration: Stormceptor Class 1 S.400/100.C1.2C with Oil Alert System

Inlet/Outlet size: 900RCP

Treatment Flow Rate: 150LPS

Total Volume: 53,300L

Excavation depth: 3.8m

The Challenge

The airport is located near to Lake Burley Griffin, so there is a need to treat and monitor all contaminated stormwater runoff from the tarmac without discharging hydrocarbons or nutrient loads to the lake.

Our Solution

SPEL was able to supply a Class 1 Stormceptor with Oil Alert System which treats and monitors the entire Airport terminal catchment.

This also ensures stormwater is safely discharged to Lake Burley Griffin whilst maintaining a strict Stormwater quality discharge and with relatively low maintenance costs.

Gallery

Share on facebook
Share on twitter
Share on linkedin
Share on pinterest
Share on email

More
articles

The flow

News | Events | Updates

You can constantly keep up to date by visiting our news pages but for added convenience why not join our mailing list and have it delivered to your inbox.

Scroll to Top